Investments

ADM Elektrik Dağıtım continues its investments at full-speed to ensure that power is supplied with high quality, sustainably and sufficiently in Aydın, Denizli and Muğla provinces, which are growing fast as an industrial and tourism center.

Total Investment by Years

ADM Elektrik Dağıtım has made an investment of 130 million TL since 2008, the year it started its operations, until 2010, and around 800 million TL during the 5-year 2011-2015 period. The company aims to invest approximately 1 billion TL in the region in the 2016-2020 period. Investments focus mostly on new power lines, renewal-improvement works and technological investments. These new investments increase the quality of the energy supplied to both the existing and new consumers on a continuous basis.

Investment Planning Strategy

In order to fully consider both future and existing requirements of consumers, ADM Elektrik Dağıtım holds discussions with local governments before making investment decisions, and conducts a professional computerized planning process. While making investments, ADM Elektrik Dağıtım spends its best efforts for ensuring that its technology- and innovation-driven works are prioritized, quality standards are increased at each phase, technological materials of global standards are used, knowledgeable and experienced qualified employees are recruited, and thus, as a natural consequence, efficiency is increased.

Long-Term Investment Design

Considering that electricity distribution networks have a useful life of 25-30 years and involve a high building cost, a long-term design is needed. ADM Elektrik Dağıtım continues is long-term planning works in order to address this requirement. The existing electricity distribution network is analyzed using remote monitoring and control systems, and data such as consumer requirements, new settlement areas to develop, the long-term plans of institutions and organizations and other various factors are brought together by master plan applications, and are modelled, resulting in the preparation of investment plans that can give the most accurate results. This is how electricity distribution networks with a useful life of 25-30 years are designed. Electricity distribution networks whose economic life has expired are determined by continuously-collected data, and long-term planning, renewal and improvement works are carried out at these facilities. All distribution network designs and plans are prepared in a manner to ensure that the requirements can be met even 25-30 years later, rather than focusing on the current requirements. With these plans, ADM Elektrik Dağıtım aims to make the most efficient use of our country's resources, and supply to consumers high-quality and uninterrupted electric energy.